An implication of this, however, is that the design must be substantially complete before steelwork fabrication can begin. A characteristic of steel framed construction is that the constituent parts of the structure are manufactured off-site, with all the quality and speed-on-site benefits that are associated with such a form of construction. Many of these stages include aspects of engineering design. Information for construction - Drawings, specifications. Detailed design - Of the various components and elements.Scheme design - Looking at and developing options.Assembling the data and developing the brief - Understanding the site and context.Project formulation - What it’s for, why is it being proposed, where is it, etc.The stages of a construction project are presented in ISE publication ‘Structural design – the engineer’s role’ which may be broadly summarised as follows: 3.1 Step 1: Initial design considerations.